The Daily Grind Drive-Thru · p-001
OPEN · 47 bids · 20 packages · 10 issues in scope gate
Last inference (vultr-inference · deepseek-v4.1-flash-1017)
This run is noncompliant: mandatory scope gaps remain, no bid covers REQ-ADDENDUM-LIGHTING, and the cheapest steel pick carries a lead time beyond 45 days, so that low number is not a valid basis for award. A prompt-injection attempt in the
Run #28Scenario comparison
raw low
$379,517.19
Not feasible
noncompliant: mandatory scope gaps
lowest compliant
$0.00
Not feasible
no bids represent mandatory REQ-ADDENDUM-LIGHTING
schedule feasible
$0.00
Not feasible
steel lead exceeds 45 days on cheapest pick
Tip: fix T-06 via package 16 bid, then re-analyze — totals and feasibility update together.
Bids
47
Packages
20
Open issues
10
Lowest compliant
Blocked
| Code | Package | Bids |
|---|---|---|
| 01 | Sitework | 3 |
| 02 | Underground utilities | 3 |
| 03 | Concrete | 3 |
| 04 | Masonry | 3 |
| 05 | Structural steel | 3 |
| 06 | Framing/carpentry | 3 |
| 07 | Roofing | 3 |
| 08 | Doors/hardware | 2 |
| 09 | Storefront/glazing | 2 |
| 10 | Drywall/insulation | 2 |
| 11 | Flooring/tile | 2 |
| 12 | Painting | 2 |
| 13 | Millwork | 2 |
| 14 | Plumbing | 2 |
| 15 | HVAC | 2 |
| 16 | Electrical | 2 |
| 17 | Fire protection | 2 |
| 18 | Fire alarm | 2 |
| 19 | Paving/striping | 2 |
| 20 | Signage | 2 |