BIDBUSTER · estimating control system

The Daily Grind Drive-Thru · p-001

Human-controlled release
DrawingsProject manualInstructions to biddersAddendum 01Bid leveling

Structured bids & requirements · Bid leveling

p001_bids_seed20261103_rev0.xlsx · Oct 3, 2026

Identity verifiedsha256:a3f8…scope-matrix

Scope coverage register

The Daily Grind Drive-Thru ·10 open gates · 10 in register (T-01–T-10)

Run analyze
GateFindingSeverityTypeRequirementStatusTags
T-01Generator diesel refueling labor for temporary power durationhighuncovered mandatory scopeREQ-TEMP-FUELopen
BLOCKING
T-02Drive-thru window perimeter flashing and weatherproofinghighuncovered mandatory scopeREQ-FLASH-DTWopen
BLOCKINGAGENT-FOUND
T-03Site drainage cleanouts per civil scope registerhighuncovered mandatory scopeREQ-DRAIN-COopen
BLOCKING
T-04Owner-furnished walk-in cooler rigging and set (OFCI)highofci unassignedREQ-OFCI-COOLERopen
BLOCKINGENGINE-FLAGGED
T-06Addendum #2 exterior soffit LED allowancehighaddendum not in bidsREQ-ADDENDUM-LIGHTINGopen
BLOCKINGADDENDUM PENDING
T-07Line-level low bids use different vendors; compliant award must pick one contractor across the bundle.highbundle split violation—open
BLOCKINGENGINE-CALCULATED
T-09Paving quantity basis 1200 SY per civil takeoffhighquantity basis mismatchREQ-PAVING-QTYopen
BLOCKINGENGINE-FLAGGED
T-10Bid security / surety bond per Division 00highuncovered mandatory scopeREQ-BID-SECopen
BLOCKING
T-05Leveling must use latest revision amounts only.mediumbid revision superseded—open
ENGINE-FLAGGEDFOR AWARENESS
T-08Raw low steel pick violates schedule; use schedule_feasible scenario.mediumschedule lead exceeded—open
ENGINE-CALCULATEDFOR AWARENESS